Bury Trial Holes – Irwell Street

Trial Holes are a quick, low cost Site Investigation method to assess the ground conditions and gain information for any underlying utility pipelines which may not have already been located. The Bury Trial Holes project was a series of 90 trial holes across Bury to help assist with future new potable water mains rehab work […]

Norland Lane

Project Date: February to March 2021 The Norlands Lane project was a complex five-week job which was mainly required to help the “as-built’s” match-up to United Utilities’ One Map. The job consisted of connecting up existing 12″, 14″and 18″ mains which had missing valves and hydrants. In addition, the current valves were spaced out across […]

Minor Works

P&H Pipelines and Services Limited undertakes minor works for many clients in the North West. Predominantly these projects are to put right following emergency utility repair works. The tasks often include: Concrete and screeding Wall reconstitution Paving and flagging Fencing Agricultural reinstatement

Utility Diversion – WP2 Mersey Gateway

The Mersey Gateway project, based around the construction of a new toll across the Mersey, has meant the diversion of many utilities in and around the Runcorn and Widnes areas. P&H Pipelines’ project was a 600mm main utility diversion to avoid the new Merseylink corridor. A key part of this diversion involved a twin horizontal directional […]

North Southport (Banks) – Mains Water

4.5Km of mains water PE pipeline has been installed in the rural area of Banks, north of Southport. The majority of the pipeline is laid in traditional open cut trenches. Also required was installation beneath a twin drainage channel, a number of ditches and three dual carriageway crossings. These crossings were undertaken using horizontal directional drilling. […]

Clapham FTS

The project was located close to the historic Clapham Railway Station, on the Leeds to Morecambe Line. 1.5Km of first time sewerage and rising main have been installed to improve services for the local communities. Additionally, a new PS has been constructed.

Winwick Road

A 300m section of main water pipeline, adjacent to this busy dual carriageway near central Warrington, has suffered multiple failures over recent years. The project required the complete replacement of the failing section whilst maintaining traffic flow on Winwick Road. 300m of 630mm replacement pipeline was installed using a combination of open cut (150m) and horizontal […]

Stockport Concessionary Supplies

P&H Pipelines & Services Ltd has completed Clusters 1 & 11 and Phase 5 II on the concessionary supply scheme, bringing first time supply to an area within the Glossop valley. More than 9Km of PE pipework has been installed between Padfield and Crowden, working along the narrow bridle path of “Longdendale Trail”. To minimise disruption […]